IDENTIFIKASI KEGAGALAN PELAKSANAAN CRASH PROGRAM DALAM PROYEK KONTRUKSI
DOI:
https://doi.org/10.21831/inersia.v13i1.14598Abstract
ABSTRACTCrash program becomes an alternative solution for the implementation of construction projects that are faced with limit time. In practice, the crash program is not easy to implement considering the two main requirements must be fulfilled: 1) the number of available resources is not an obstacle and 2) if the desired time of completion is completed faster with the same scope, then the resource requirements will increase. This study aims to identify the factors that cause failure of crash program implementation in construction project. Quantitative and qualitative approaches are carried out simultaneously in analyzing secondary data and primary data. Weekly progress achievement as secondary data and primary data such as respondent (owner, head of construction management, project manager, and site manager) interview reports. The result of the analysis shows that the failure of crash program implementation is caused by three main factors: 1) materials unavailability, 2) inadequate human resources and 3) lack of achievement of specification.Keywords: crash program, construction projectABSTRAKCrash program menjadi alternatif solusi bagi pelaksanaan proyek konstruksi yang dihadapkan pada waktu pelaksanaan yang sangat sempit. Dalam pelaksanaannya, crash program tidak mudah dilaksanakan mengingat dua persyaratan utama harus terpenuhi yaitu:1) jumlah sumber daya yang tersedia tidak merupakan kendala dan 2) bila diinginkan waktu penyelesaian kegiatan lebih cepat dengan lingkup yang sama, maka keperluan sumber daya akan bertambah. Penelitian ini bertujuan mengidentifikasi faktor-faktor penyebab kegagalan pelaksnaan crash program dalam proyek konstruksi. Pendekatan kuantitatif dan kualitatif dilakukan secara bersamaan dalam menganalisa data sekunder dan data primera. Data sekunder berupa capaian progress mingguan dan data primer berupa interview responden (Owner, pimpinan manajemen konstruksi, project manager, dan site manager). Hasil analisa menunjukkan bahwa kegagalan pelaksanaan crash program disebabkan oleh tiga faktor utama yaitu: 1) ketidaktersediaan material, 2) SDM yang tidak memadai dan 3) kurangnya pencapaian spesifikasi.Kata kunci: crash program, proyek konstruksiDownloads
Published
2017-06-22
How to Cite
Bawono, S. E. (2017). IDENTIFIKASI KEGAGALAN PELAKSANAAN CRASH PROGRAM DALAM PROYEK KONTRUKSI. Inersia : Jurnal Teknik Sipil Dan Arsitektur, 13(1), (54–65). https://doi.org/10.21831/inersia.v13i1.14598
Issue
Section
Articles
License
Authors who publish with INERSIA journal agree to the following terms:
- Authors retain copyright and grant the INERSIA journal right of first publication with the work simultaneously licensed under Creative Commons Attribution License (CC BY 4.0) that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
- Authors can enter into separate, additional contractual arrangements for the non-exclusive distribution of the published version of the work (e.g., post it to an institutional repository or edit it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) before and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.

INERSIA by https://journal.uny.ac.id/index.php/inersia was distributed under a Creative Commons Attribution 4.0 International License